Weekly Users' Meeting Minutes -- January 14, 2009
Schedule
X-ray: Beam Observation today 1/14/09. All x-ray beamlines are asked to observe beam and report any problems to Control Room. Beam will be new X9 orbit.
VUV: Timing run cancelled for Monday 1/19/09 and Monday 1/26/09, 1800 - 2400 hrs Time is returned to normal operations.
VUV timing runs will most likely be the last two weeks of Feb and the 1st week of March. Details will be announced when available.
**The official weekly x-ray ring schedule is posted on NSLS TV Channel 11, which is also available
on the schedules page by click on Short Range Schedules.
**The official weekly VUV ring schedule is posted on NSLS TV Channel 5, which is also available
on the schedules page by click on Short Range Schedules.
Machine Status
Emil Zitvogel said that there are difficulties with x-ray ramp up and also heating of X7's water-cooled mask. Temperature sensors and a water cooling jacket are being installed on the affected area in the X7 front end. The goal is to have X-ray ring up and running by today, 1/14/09. Beam observation will be a 3 hour window, preferably finished by 3 PM.
The leak in the X27 front end at the water-cooled mask has not returned and the temperature has been lowered by the water-cooled jacket installed.
Lab Holiday
Please note that Monday 1/19/09, Martin Luther King Day, is a lab holiday and most NSLS staff will be unavailable. The Control Room and OPCOs will be on duty.