Weekly Users' Meeting Minutes -- February 4, 2009
Schedule
X-ray: There will be an emergency ring access tomorrow morning (2/5) to repair an X13A slits drive.
VUV: Proposed timing runs during February and March.
Feb 21: 1800 - 0230 Timing 7 bunch detuned Feb 23: 1800 - 0230 Timing 7 bunch detuned [1800 - 2400 scheduled Timing] Feb 27: 1800 0230 Timing 7 bunch compressed [1800 2400 Studies] Feb 28: 1800 0230 Timing 7 bunch detuned Mar 1: 1800 -0230 Timing 7 bunch detuned Mar 2: 1800 -0230 Timing 7 bunch detuned Mar 3: 1200 - 2400 Timing 7 bunch compressed [0800 2400 Studies] Mar 4: 1200 - 2400 Timing 7 bunch compressed [0000 2400 Studies]
**The official weekly x-ray ring schedule is posted on NSLS TV Channel 11, which is also available
on the schedules page by click on Short Range Schedules.
**The official weekly VUV ring schedule is posted on NSLS TV Channel 5, which is also available
on the schedules page by click on Short Range Schedules.
Machine Status
Both rings are running well.
The water pumps were mistakenly turned off Monday at about 1400 hrs. for about 10 minutes. There was no announcement or Channel 2 posting from the Control Room, but there will be in the future.
Maintenance Period (X-ray: 2/10/09-2/11/09, VUV: 2/9/09-2/10/09)
Plug doors to be opened are: X3-4, X5-6, X7-8 and X27-28.
X-ray Template Times
The UEC has recommended a change to x-ray template times. The current template days will go away and be replaced by the 2000 - 2400 hrs period immediately after the Studies periods ending at 2000 hrs. This occurs about once per month (see 2/17, 3/10, 4/7). Emil will see if this can begin this month.
X9 Orbit
Leon Flaks requested information about the resetting of PUEs due to the new X9 reference orbit. Boris will get these to him.
Town Meeting
The next town meeting is scheduled for Wednesday, 2/18/09.
Storage Areas - Bob Kiss
Storage areas are being cleaned up & cleared out, basement area of 535 (C-6) and 1-123J (cubicle). Unclaimed equipment will be thrown out. Please contact Bob Kiss (x3476 or kiss@bnl.gov) for more information.
Lab Stewardship - Andrew Ackerman
Deadline is March 6 on lab stewardship issues. Need better compliance from user community. Steve Hulbert asked for a weekly progress update.
VUV Floor Lockout 2/3/09
Darํo Arena asked why there wasn't advance notice about the VUV floor lockout yesterday (2/3). Sergei Seletskiy said it was his Studies and he will provide advance warning in the future.