|
Archive: 2009 | 08 | 07 | 06 | 05
Weekly Users' Meeting Minutes -- April 22, 2009
Schedule
X-ray: There will be an observation on Tuesday 4/28/09. 0800-1200 hrs. of the EPW running at 47 Hz from its current 22 Hz. All users are encouraged to observe. Results will be discussed at the next User Meeting
VUV: U. of Florida group is planning to come for timing runs during July. Their proposed timing schedule is:
July 10: 1800 – 0230 Timing 7 bunch detuned [1800 – 2400 Scheduled Timing] July 11: 1800 – 0230 Timing 7 bunch detuned July 12: 1800 – 0230 Timing 7 bunch detuned July 13: 1800 – 0230 Timing 7 bunch detuned [1800 – 2400 Scheduled Timing] July 17: 1800 – 0230 Timing 7 bunch compressed [1800 – 2400 Studies] July 18: 1800 – 0230 Timing 7 bunch detuned July 19: 1800 – 0230 Timing 7 bunch detuned July 20: 1800 – 0230 Timing 7 bunch detuned July 21: 1200 – 2400 Timing 7 bunch compressed [0800 – 2400 Studies] July 22: 1200 – 2400 Timing 7 bunch compressed [0000 – 2400 Studies]
**The official weekly x-ray ring schedule is posted on NSLS TV Channel 11, which is also available
on the schedules page by click on Short Range Schedules.
**The official weekly VUV ring schedule is posted on NSLS TV Channel 5, which is also available
on the schedules page by click on Short Range Schedules.
Machine Status
X-ray ring is running at 2.584 GeV due to RF3 being down. A spare diode stack is being installed and tested. If this is successful 2.8 GeV operations will be attempted at today's 7 PM fill. (Note: this was successful)
Please see attached file for Emil Zitvogel's User Meeting presentation.
VUV Floor Lockout
The VUV floor will be locked out for injection studies this Friday April 24 1800 – 2100 hrs, and also on Tuesday April 28 and Wednesday April 29 from 1700 to 2000 hrs.
May Shutdown
Next User Meeting (4/29) Payman Mortazavi will come to describe the maintenance work that will take place during the shutdown.
Subscribe to the email list for
X-Ray and VUV minutes and schedules
|