|
Archive: 2009 | 08 | 07 | 06 | 05
Weekly Users' Meeting Minutes -- May 27, 2009
Schedule
X-ray: No special requests.
VUV: U. of Florida group is planning to come for timing runs during July. Their proposed timing schedule is:
July 10: 1800 – 0230 Timing 7 bunch detuned [1800 – 2400 Scheduled Timing] July 11: 1800 – 0230 Timing 7 bunch detuned July 12: 1800 – 0230 Timing 7 bunch detuned July 13: 1800 – 0230 Timing 7 bunch detuned [1800 – 2400 Scheduled Timing] July 17: 1800 – 0230 Timing 7 bunch compressed [1800 – 2400 Studies] July 18: 1800 – 0230 Timing 7 bunch detuned July 19: 1800 – 0230 Timing 7 bunch detuned July 20: 1800 – 0230 Timing 7 bunch detuned July 21: 1200 – 2400 Timing 7 bunch compressed [0800 – 2400 Studies] July 22: 1200 – 2400 Timing 7 bunch compressed [0000 – 2400 Studies]
**The official weekly x-ray ring schedule is posted on NSLS TV Channel 11, which is also available
on the schedules page by click on Short Range Schedules.
**The official weekly VUV ring schedule is posted on NSLS TV Channel 5, which is also available
on the schedules page by click on Short Range Schedules.
Machine Status
VUV ring in operations. X-ray ring to start commissioning shortly.
Automatic LN2 System - Payman Mortazavi
Presentation of the new LN2 filling station: just connect (correctly) and push a button and the dewar will fill up automatically. A lot of new safety features. It will be ready in a few days. Next step will be training of people. A web course is in preparation. A camera pointing at the LN2 fill station is working; it will be possible to use it via the web to see if anybody is using it (web address not ready yet).
Subscribe to the email list for
X-Ray and VUV minutes and schedules
|