Archive: 2009 | 08 | 07 | 06 | 05

Weekly Users' Meeting Minutes -- July 8, 2009


Schedule

X-ray: No special requests.

VUV: U. of Florida group is planning to come for timing runs during July.
Their proposed timing schedule is:

July 10: 1800 – 0230 Timing 7 bunch detuned [1800 – 2400 Scheduled Timing]
July 11: 1800 – 0230 Timing 7 bunch detuned
July 12: 1800 – 0230 Timing 7 bunch detuned
July 13: 1800 – 0230 Timing 7 bunch detuned [1800 – 2400 Scheduled Timing]
July 17: 1800 – 0230 Timing 7 bunch compressed [1800 – 2400 Studies]
July 18: 1800 – 0230 Timing 7 bunch detuned
July 19: 1800 – 0230 Timing 7 bunch detuned
July 20: 1800 – 0230 Timing 7 bunch detuned
July 21: 1200 – 2400 Timing 7 bunch compressed [0800 – 2400 Studies]
July 22: 1200 – 2400 Timing 7 bunch compressed [0000 – 2400 Studies]

**The official weekly x-ray ring schedule is posted on NSLS TV Channel 11, which is also available on the schedules page by click on Short Range Schedules.

**The official weekly VUV ring schedule is posted on NSLS TV Channel 5, which is also available on the schedules page by click on Short Range Schedules.



Machine Status

RF Studies will occur this afternoon to investigate dropouts in x-ray
ring during injection.



NSLS-II Site Soil Compacting

There will be soil compacting at the NSLS-II site on the following dates:

7/13, 7/14, 7/15, 7/16, 7/17.

Please be aware of possible vibrations at NSLS due to these activities.


Schedule for September-December 2009

The September-December 2009 schedule has been signed.


Automatic LN2 fill system

The automatic LN2 fill system has been modified and will require additional
training to use.



 

Subscribe to the email list for X-Ray and VUV minutes and schedules