Weekly Users' Meeting Minutes -- August 5, 2009


Schedule

X-ray: No special requests.

VUV: Timing runs cancelled for Friday 8/7/09 and Monday 8/10/09,
1800 - 2400 hrs. Time is returned to normal operations.

**The official weekly x-ray ring schedule is posted on NSLS TV Channel 11, which is also available on the schedules page by click on Short Range Schedules.

**The official weekly VUV ring schedule is posted on NSLS TV Channel 5, which is also available on the schedules page by click on Short Range Schedules.



Machine Status

Both rings are running well.



X29

A problem was discovered at the X29 front end water supply. It was
found that 1 of the 6 Proteus flow switches on the line had tripped
the interlock (causing beam dump). All of the Proteus flow switches
were replaced and everything was back to normal.


NSLS II Construction - Soil Compacting

There should be no operations in the Northwest quadrant the next three weeks
(8/10 - 8/28) that will require the use of the large Roller/compactor.


 