Weekly Users' Meeting Minutes -- September 23, 2009


Schedule

X-ray: There will be two observations of an X9 orbit bump next week
during Studies, one on Monday 9/28/09, 1200-1400 hrs and one on
Thursday 10/1/09, 1000-1200 hrs. All beamlines are encouraged
to observe.

VUV: No special requests.

**The official weekly x-ray ring schedule is posted on NSLS TV Channel 11, which is also available on the schedules page by click on Short Range Schedules.

**The official weekly VUV ring schedule is posted on NSLS TV Channel 5, which is also available on the schedules page by click on Short Range Schedules.



Machine Status

Both rings are running well.

The x-ray ring is studying operating at 30 bunches (rather than the
normal 25) to increase beam lifetime.



Maintenance Period (X-ray: 9/29/09-9/30/09, VUV: 9/28/09-9/29/09)

Plug doors to be opened are: X5-6.


NSLS II Construction – Soil Compacting

The large compactor may be in operation in the NW corner
of the site 9/30/09 - 10/2/09 and 10/5/09 - 10/9/09.


Empty Gas Cylinder Disposal

Empty gas cylinders are supposed to be placed at the “Empty” racks
with caps on. There are curently about 5 empty cylinders with no caps
in the “Empty” area. The gas truck will not pick up empty cylinders
without caps.



 