Light Sources Directorate Policies and Requirements Manual


Number: LS-ESH-PRM-1.5.1
Section: LOCKOUT/TAGOUT REQUIREMENTS
Date: 06/23/2008
Revision: 11
Prepared by: John Aloi
Approved by: Andrew Ackerman , ESH/Q Manager


All personnel working within the NSLS complex are required to follow the requirements set forth in the BNL Subject Area, Lockout/Tagout (LOTO).

Additional NSLS specific LOTO requirements follow. These requirements apply to all except for BNL Plant Engineering personnel:



PRM Table of Contents


Document Review Frequency 3 Years

Review signatures on file with master copy of controlled document

LIGHT SOURCES DIRECTORATE REVISION LOG
Document Number: LS-ESH-PRM-1.5.1
Subject: LOCKOUT/TAGOUT REQUIREMENTS

> See NSLS Quality Control Coordinator for original revision and review signatures <

REVISION TABLE
Rev Description Date
3 Original Document 08/11/98
4 Section 1.2 and 2. have been rewritten 08/28/01
5 New Attachments added (Nos. 3.3, 3.4, 3.5) 03/28/02
6 New Attachment added (No. 3.6) 07/28/03
7 Document underwent major revisions to reflect NFPA 70E requirements. 01/28/05
8 Multiple Use Red Tag program has been terminated; all text references have been deleted. 04/08/05
9 Section 1.3 text was changed to clarify that two separate LOTO logbooks exist, NSLS and DUV-FEL.
Section 2.2 text was changed to clarify training requirements for non-electrical LOTO.
01/09/06
10 PRM 1.5.1 now points to the requirements in the new BNL LOTO Subject Area. In addition, requirements for the newly established long term logbook have been added to the PRM. 5/21/2007
11 Added a section to the PRM to give NSLS personnel the authority to perform lock only maintenance work. 6/23/2008


For information regarding this document contact J. Aloi, aloi@bnl.gov