Number:

LS-ESH-PRM-2.2.4

Section:

CONFINED SPACES

Date:

06/21/06

Revision:

3

Prepared by:

Nicholas F. Gmür

Approved by:

Chi-Chang Kao, Interim Chairman

 

 


The NSLS will follow the procedures and guidance supplied in the BNL Confined Spaces Subject Area.

 

NSLS confined spaces are noted in the Fire House Response Card System.

 

The NSLS has defined the following Class 2A confined spaces:

 

  1. Two Helium gas tanks at northwest corner of Bldg. 725 (see Attachment 1);
  2. Air ducts in Bldg. 725 (see Attachment 2).
  3. Confined Space Procedures for Accessing 8 ft Deep Floor Pit in NSLS Room 1-169 (LEGS Cryolab).

 

The Confined Space programs established for each of the above are given as Attachments to this PRM.

 

Building 725 contains additional confined spaces managed by BNL's Plant Engineering.  These will not be listed in this PRM.

 


Attachment 1

Attachment 2, page 1, 2, 3

Attachment 3


The only official copy of this file is the one on-line in the NSLS ESH website. Before using a printed copy, verify that it is the most current version by checking the document issue date on the NSLS ESH website.

Table of Contents

Privacy and Security Notice

BNL Home Page..........NSLS Home Page

For information regarding this document contact Nicholas Gmur, gmur@bnl.gov
Maintained by K. Loverro loverro@bnl.gov