The only official copy of this file is the one on-line in the NSLS ESH website. Before using a printed copy, verify that it is the most current version by checking the document issue date on the NSLS ESH website.
Light Sources Directorate Policies and Requirements Manual
| Number: | LS-ESH-PRM-2.3.2 |
| Section: | RF AND MICROWAVES |
| Date: | 02/16/10 |
| Revision: | 5 |
| Prepared by: | Lori Stiegler, Roy D'Alsace |
| Approved by: | Andrew Ackerman |
-
Potential hazards, controls and requirements to be followed regarding the use of radio frequency and microwave radiation are detailed in the Radiofrequency/Microwave Radiation Subject Area. This Subject Area covers the frequency range of 30 kHz to 300 GHz for instruments such as fixed or portable RF/microwave emitters, particle accelerators, induction heaters, and certain power supplies.
-
Inventories and surveys of sources shall be maintained by the Light Sources ES&H Coordinator in collaboration with the NSLS and NSLS-II Electrical and RF Groups and may be found in the Attachments below.
-
Significant changes in equipment require re-evaluation. Changes in the system such as routine maintenance and in-kind replacement of failed components, i.e., elements, do not trigger the need for re-evaluation.
Inventories and Surveys
RF & Power Systems Group CW Inventory
RF & Power Systems Group Pulsed Inventory
Electrical Support Group Inventory
RF Survey – January 29, 2008 (XRF1 & VUVRF2)
RF Survey – January 14, 2009 (RF Penthouse)
RF Survey – September 29, 2008 (902B, NSLS-II, BPM)
RF Survey –
March 20, 2009 (832, NSLS-II, Petra-7)
RF Survey – April 23, 2009 (832, NSLS-II, Petra-7)
![]() | PRM Table of Contents |
| Document Review Frequency | 3 Years |
Review signatures on file with master copy of controlled document
| LIGHT SOURCES DIRECTORATE REVISION LOG | |
| Document Number: | LS-ESH-PRM-2.3.2 |
| Subject: | RF AND MICROWAVES |
> See NSLS Quality Control Coordinator for original revision and review signatures <
| REVISION TABLE | ||
| Rev | Description | Date |
| 1 | Original Document | 06/19/95 |
| 2 | Deleted out-dated and repetitive information. Established Web link to SBMS ESH Standard 2.3.2. | 01/22/01 |
| 3 | Updated Chairman's name | 01/30/04 |
| 4 | Updated Chairman's name and added Roy D'Alsace as a preparer. Changed link from the RF ESH Standard to the SBMS RF Subject Area. Added descriptive text to section 1. Changed MARTI to EIS in Section 3. Added Attachments for RF inventories and surveys. | 02/05/07 |
| 5 | Updated all inventories. Included NSLS-II inventories and surveys. Removed reference to EIS. Added description of changes that need re-survey. | 02/16/10 |
For information regarding this document contact L. Stiegler, stiegler@bnl.gov


